SIC reminds builders that advertised common areas are part of the legal quality guarantee

Maqueta arquitectónica de un conjunto residencial con torres de apartamentos y piscina sobre un escritorio de madera

Buying a home off-plan in a staged project does not take away the buyer’s right to receive the advertised common areas. The Superintendence of Industry and Commerce made this clear in an opinion of September 2026, stating that the material and timely delivery of the offered common areas is part of the property’s legal quality guarantee. The clarification responds to recurring complaints from buyers of apartments, houses and lots.

What did the Superintendence of Industry and Commerce clarify?

The entity answered a consultation about housing real estate projects marketed and executed in stages, in which builders register and deliver the private units but do not deliver all the common areas offered and advertised at the time of sale. The Superintendence stated that builders and marketers must supply clear, truthful, sufficient, timely, verifiable, understandable, precise and suitable information about the common areas, indicating which ones correspond to each phase of the project and the estimated time for their execution.

Does the project’s advertising create obligations?

Yes. The Superintendence recalled that advertising, brochures, renders and scale models create obligations for the advertiser, since the objective and specific conditions announced in the advertising bind the advertiser. If a builder sold apartments in a first stage announcing a gym and a swimming pool, it must deliver them within the estimated time it informed and cannot omit them with the argument that the project is developed in stages.

Are common areas part of the legal quality guarantee?

Yes. The entity indicated that the material and timely delivery of the offered common areas is part of the property’s legal quality guarantee. Breaching it may give rise to consumer claims and to the enforcement of contractual obligations through the corresponding channels.

Is there a general deadline for delivering the common areas?

No. The Superintendence clarified that there is no general deadline that can be established through an opinion for all projects. The assessment of possible breaches must consider the particular circumstances of each project and the provisions of the horizontal property regime and the Consumer Statute.

What can buyers do in the event of a breach?

Buyers can review the advertising and information received at the time of sale, demand compliance with the announced conditions and file the corresponding claims. Builders, for their part, must accurately inform which common areas correspond to each stage and when they will be executed. This summary does not replace reading the opinion or analyzing the specific case.

If your organization develops staged real estate projects or is assessing its obligations toward buyers, you may consult our Real Estate Law team.

Source: Superintendence of Industry and Commerce, Opinion docket 26-336905 of September 2026.

Official document: Opinion of the Superintendence of Industry and Commerce, docket 26-336905 (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.

SIC warns that housing delivery extensions must be timely informed and justified

Calendario de escritorio en blanco con un reloj de arena y una pluma sobre un escritorio de madera oscura

A change in a home’s delivery date cannot simply be imposed on the buyer. The Superintendence of Industry and Commerce clarified in an opinion of July 2026 that builders must timely inform modifications to deed-signing and delivery dates, explain their reasons and provide the support that justifies the extension. The opinion protects buyers of new housing who face postponements of the dates promised in their contracts.

What did the Superintendence of Industry and Commerce clarify?

The entity resolved a consultation about date changes in the delivery of new homes. It stated that builders, developers and marketers have the duty to supply clear, truthful, sufficient, timely, verifiable, understandable, precise and suitable information about the conditions of marketing, deed signing and delivery of the properties. In particular, delivery and deed-signing dates must be informed from the precontractual stage and established in the purchase promise agreement.

How must extensions be communicated?

Any modification of the agreed dates must be communicated to the buyer in a timely manner, explaining the reasons for the change and providing the support that justifies the extension when it responds to causes beyond and not attributable to the builder. For example, if a builder must postpone the delivery of an apartment due to a delay in a permit beyond its control, it must notify the buyer with reasonable advance notice and documentarily support the cause of the postponement.

Can the builder modify the dates unilaterally?

No. The Superintendence recalled that unilateral modifications are prohibited by Law 1480 of 2011, the Consumer Statute. In addition, clauses that generate an unjustified imbalance to the consumer’s detriment may be considered abusive and ineffective as a matter of law, so they produce no legal effects.

Who decides whether there was a breach?

The entity clarified that determining possible breaches corresponds to the competent authorities or the ordinary jurisdiction, depending on the matter. The opinion does not resolve particular cases, but it sets the information duties and the rules applicable to extensions.

What should buyers and builders review?

Buyers must verify that the purchase promise agreement fixes the deed-signing and delivery dates, and demand information and support in the face of any change. Builders must document the causes of each extension and communicate them in a timely manner, under penalty of claims and of the ineffectiveness of abusive clauses. This summary does not replace reading the opinion or analyzing the specific case.

If your organization markets housing or is assessing its obligations toward buyers, you may consult our Real Estate Law team.

Source: Superintendence of Industry and Commerce, Opinion docket 26-232460 of July 2026.

Official document: Opinion of the Superintendence of Industry and Commerce, docket 26-232460 (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.

Not processing the partial plan does not turn developable land into non-developable land

The Council of State reaffirmed that a developable lot whose owner does not process its partial development plan cannot be treated as non-developable in order to pay less property tax. The ruling, issued in a case against the District of Bogotá, closes that route to tax savings.

A developable lot whose owner does not process its partial development plan cannot be treated as non-developable in order to pay less property tax. The Council of State has reaffirmed that rule in a case against the District of Bogotá.

In a ruling of October 1, 2026, the Fourth Section decided a dispute over the property tax for the 2017 fiscal year of two properties. The central point was whether a lot could be declared as non-developable, at a 5 per mil rate, when the owner had not pursued the partial plan procedure required to develop it, which places it in the category of developable not developed, with rates that in Bogotá reach 33 per mil.

What is a partial plan and why does it matter here?

It is the planning instrument that develops the urban norms of a portion of urban or expansion land and whose processing corresponds to the owners. Without an approved partial plan the land cannot be developed, but that lack of procedure does not change the fiscal classification of the lot.

What did the Council of State decide?

That the classification of the lot depends on the urban norms and not on the owner’s attitude. If the norm classifies it as developable, the owner’s inactivity in processing the partial plan does not turn it into non-developable, so it cannot access the lower rate reserved for rural or non-developable land.

The case arose because the administration corrected the owner’s tax returns and assessed a higher tax with an inaccuracy penalty. The first instance court partially sided with the taxpayer and the Chamber reviewed that decision, with partial dissents, which shows the debate the topic raises within the court.

What should be kept in mind?

Owners of lots in urban or expansion land should review the classification that urban norms assign to their property and not assume that the lack of development reduces the rate. This summary does not replace reading the full text of the ruling.

If you own urban or expansion lots and have doubts about their classification and property tax rate, you may consult our Real Estate Law team.

Source: Council of State, Fourth Section, ruling of October 1, 2026, docket 25000-23-37-000-2021-00538-01 (case 29726).

Official document: Council of State ruling, case 29726 of 2026 (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.

Each condominium unit must have its own water metering

In condominium buildings each unit must have its own water metering. The Superintendence of Residential Public Utilities has explained how leaks and consumption deviations must be billed under that scheme.

In condominium buildings, the rule is that each unit has its own water metering. The Superintendence of Residential Public Utilities has explained how leaks and consumption deviations must be billed.

Through Concept SSPD-OJ-2026-255 of August 23, 2026, the Superintendence of Residential Public Utilities answered a consultation on water metering instruments in buildings subject to the horizontal property regime, including cases of perceptible and imperceptible leaks and significant consumption deviations.

What is individual metering and what role does the control meter play?

Individual metering means that each property unit has its own meter and pays according to its actual consumption. The general or control meter that the building may have is not used to bill residents, but to verify the difference between the water entering and what the individual meters register.

How is billing handled when there is an imperceptible leak?

The concept recalls that in the case of an imperceptible leak, that is, one that is not visible or detectable by the user, the regulation provides a relief mechanism. The user has a two-month period to repair it and, in the meantime, billing is based on the average consumption of the last six months, not on the consumption inflated by the leak.

Significant consumption deviations, for their part, require the provider to investigate before billing, since they may be due to measurement failures or other causes beyond the user’s control.

What should be kept in mind?

Condominium administrations must distinguish between the control meter and individual meters, and users must immediately report anomalies to activate defense mechanisms. This summary does not replace reading the full text of the concept.

If you manage or live in a condominium building and have doubts about water billing, you may consult our Real Estate Law team.

Source: Superintendence of Residential Public Utilities, Concept SSPD-OJ-2026-255 of August 23, 2026.

Official document: Concept SSPD-OJ-2026-255 of the Superintendence of Residential Public Utilities (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.

Decree 1493 of 2026 regulates the exceptional utilities subsidy

When a disaster damages a home, water and sanitation bills do not wait for the family to recover. A recent Housing Ministry decree organizes how the exceptional subsidy that eases those charges works in such situations.

Decree 1493 of October 6, 2026, of the Ministry of Housing, City and Territory, published in Official Gazette 53,650, regulates the exceptional subsidy provided for in Law 1506 of 2012 and the measures applicable to residential public utilities (water, sewerage and sanitation) when the Government declares a disaster situation. The rule is already in force and sets the general conditions for applying those benefits.

What is the exceptional public-utilities subsidy?

It is a mechanism created by article 2 of Law 1506 of 2012 to ease the payment of residential public utilities for people affected by a disaster situation declared by the National Government. The decree makes clear that applying the subsidy cannot mean that utility providers bear the cost: the Ministry must guarantee certain, sufficient and timely mechanisms for recognizing and disbursing the funds.

Who can receive it and how is it calculated?

Beneficiaries are the affected or disaster-stricken subscribers or users belonging to the subsidizable socioeconomic strata defined in the public-utilities law (generally strata 1, 2 and 3), who have been included in the respective emergency registry. For water and sewerage, the subsidy is calculated on the current tariffs and before applying the ordinary subsidies, so that the exceptional benefit adds to the usual scheme.

What else does the decree regulate?

Among other points, it provides that the benefit may apply to the destination property for the remainder of its term, and the measures for repairing, replacing or rebuilding household water and sewerage connections affected totally or partially by the disaster. The law provides that the subsidy is granted only once per emergency.

For example, a stratum-2 family whose home was damaged by a declared disaster and who was included in the victims’ registry could receive relief on the water bill while another dwelling is prepared, and manage the replacement of the damaged connection under the framework set by the decree. This is a hypothetical case that illustrates the rule’s application.

What should be kept in mind?

The benefit is not automatic: it requires the declaration of the disaster situation, inclusion in the victims’ registry and the stratum conditions. For owners and tenants of affected properties, it is worth checking the registry and the effective dates, and for utility companies, the rules for disbursing and recognizing funds. This summary does not replace reading the full text of the decree.

If your home or property was affected by a disaster situation and you have doubts about these benefits, you can consult our Real Estate Law team.

Source: Ministry of Housing, City and Territory, Decree 1493 of October 6, 2026, Official Gazette 53,650.

Official document: Decree 1493 of 2026 (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.

Additional Building Rights for Post-Earthquake Reconstruction: The Housing Ministry’s Draft Decree

A building was damaged by the earthquake and rebuilding costs more than its owners can pay. A draft decree proposes a way out, and there is still time to comment on it.

Colombia’s Ministry of Housing, City and Territory published for comment a draft decree on two measures for rebuilding after the earthquake of August 10, 2026. The first allows, in exceptional cases, building more floor area than city planning rules normally permit (called additional building rights) so that rebuilding damaged buildings is viable. The second exempts certain prefabricated housing from a construction permit. It is a draft, not a rule in force, and comments are open until October 31, 2026.

An illustrative example: an apartment building was damaged and must be rebuilt. The owners cannot cover the cost if they only replace what was there. If the authority allows a few more floors, part of those new apartments can help pay for the work. The draft sets out who can ask for this and with what requirements.

What is the draft and what does it regulate?

If you own an urban property in an area affected by the earthquake or work in housing construction, a new draft decree could allow building beyond what zoning rules currently authorize. The draft regulates the additional building rights for reconstruction and prefabricated housing provided for in Legislative Decree 1422 of 2026. Knowing its scope now lets owners and builders prepare for when it is adopted.

It is a draft decree that adds a chapter and articles to Decree 1077 of 2015 (the single decree of the housing sector). It regulates, meaning it details how to apply, articles 10 and 20 of Legislative Decree 1422 of September 17, 2026, issued during the economic, social and ecological emergency. It was published on October 16, 2026 and comments close on October 31, 2026.

Which properties could receive additional building rights?

Urban properties that were already built before August 10, 2026, whose buildings were affected by the earthquake and need full or partial reconstruction. They must have immediate access to public utilities and not be on protected land or in high-threat zones or areas of risk that cannot be mitigated. Cultural heritage properties remain under their special protection regime.

Who authorizes it and with what requirements?

The municipal or district mayor authorizes it through a reasoned act, on their own initiative or on request. The request must include, among other things, the identification of the properties, proof of the damage, a technical description of the project, a public utilities certificate and a financial model. In condominium-type ownership (buildings with apartments owned by different people), the favorable vote of at least 70% of the co-ownership coefficients is required, which are the percentages each owner holds. In associated management, a trust (a fund that manages the project) with at least 70% of the owners as beneficiaries is required. The authority must decide within 30 business days after a complete filing.

What happens with urban obligations and the plusvalía?

The authorization must set the project’s urban obligations according to the additional use authorized, for example land transfers or contributions to public space. The plusvalía is the increase in value a property gains when city rules allow building more; the draft provides that, in this exceptional measure, the plusvalía share may be paid in kind. The act granting the building rights does not replace the urban permits that apply.

What does it provide on prefabricated housing?

During the two years after Legislative Decree 1422 of 2026 takes effect and in the defined territory, housing with earthquake-resistant prefabricated systems would not need a construction permit, if they meet the technical and safety conditions in the draft. Technical requirements, registration and control, and installation on rural land are also regulated.

What should be kept in mind?

Having seen what the draft proposes, what remains is what to do while it is defined.

Since it is a draft, its text may change before the final decree, which only applies from its publication in the Official Gazette. Owners, builders and reconstruction project managers can submit comments until October 31, 2026. This summary does not replace reading the draft.

So for the owners of the damaged building, the draft opens a possible way out; its text may still change, which is why it is worth commenting before October 31, 2026.

If you are an owner or developer of a reconstruction project and want to submit comments before October 31, 2026, you are welcome to consult our Real Estate Law team.

Source: Ministry of Housing, City and Territory, draft decree to regulate articles 10 and 20 of Legislative Decree 1422 of 2026 (published on October 16, 2026).

Official document: Housing Ministry draft decree (PDF).

To share legal information in a timely and agile manner, this article and its image were prepared with the assistance of artificial intelligence based on the cited official document. Final review of the content and the decision to publish it rest with our team.